Photogallery.As part of the first stage of construction of the multifunctional building, building U, including the heat exchange station, was demolished and the water and sewer connections were relocated. This is one of three buildings. A new building will be constructed on the resulting site. The demolition of the buildings is necessary for ground leveling.